£400k
DMC contributed to the project by providing and installing ceramic floor tiling, screeding, stair nosings and wall tiling. Due to the complex nature of setting out the curved tunnel flooring, all tiles had to be water jetted off-site. Getting this done accurately was essential to the project’s success. In addition, the floor design had to be reflected in the ceiling, which we achieved thanks to early and collaborative design workshops with the ceiling contractor.
You can find out more about the King’s Cross Tunnel here. If you would like to learn more about DMC’s involvement, please get in touch.
As part of the station redevelopment, DMC was instrumental in delivering wall and flooring finishes.