TfL
Unkown
Taylor Woodrow/BAM Nuttall
£4m
Before a £700 million upgrade of the station was completed in 2018, the station experienced such overcrowding that crowd control measures had to be deployed on a regular basis. The revamped station is now twice its original size and now provides accessible, step-free access.
As part of the station redevelopment, DMC was instrumental in delivering wall and flooring finishes. Using the experience we have gained from completing over 100 stations throughout the London Underground, we were able to deliver this project with significant value engineering whilst still maintaining the required aesthetics and historical charm of the old station.
If you would like to learn more about DMC’s work on the Underground network, please get in touch.
DMC played a major role in this project, which needed a significant upgrade.
View projectDMC was chosen by Tube Lines to undertake major renovation works at the station.
View project