Bristol Airport is the eighth busiest airport in the UK, catering for nearly nine million passengers in 2019. During that year, demolition work began on its old terminal building, which was originally built in the 1950s. Airport owners OTPP had the ambition to create a fully modern facility, designed to help the airport achieve its aim of achieving net-zero operations by 2030.

DMC played an integral role in this major project. In particular, we installed over 5,000m2 of ceramic, porcelain and terrazzo tiling to terminal extensions, existing terminals, toilets and walkways. These works also incorporated screeding, matwells, access covers, gatelines, structural joints and soft flooring.

Andrew Goodenough, Head of Airport Development, praised DMC’s role in the project:

“DMC completed the terrazzo package for the Bristol Airport Extension. I confirm they fulfilled all their obligations of the contract and were extremely helpful in detailing their design and identifying cost savings options for the project.”

If you would like to learn more about our work at Bristol Airport, please get in touch.

“DMC completed the terrazzo package for the Bristol Airport Extension. I confirm they fulfilled all their obligations of the contract and were extremely helpful in detailing their design and identifying cost savings options for the project.”

Related Projects

Gatwick North Terminal Refurbishment

DMC has played a significant role in the North Terminal’s refurbishment. Working in collaboration with Balfour Beatty since 2013.

View project

Heathrow Airport Terminals 1 – 3

DMC was chosen by Tube Lines to undertake major renovation works at the station.

View project