Gatwick Airport Ltd
Gatwick Aiport
Balfor Beatty
£5m
The airport has two major terminals: South, which opened in 1958, and North, which was unveiled in 1988. The North Terminal has a footprint of 98,000m2 and has recently been the subject of major investment, with the aim of transforming it into a world-class terminal.
DMC has played a significant role in the North Terminal’s refurbishment. Working in collaboration with Balfour Beatty since 2013, we have completed the entire flooring package for Level 10, including toilets, check-in, baggage areas, access routes and the World Duty Free zones. Work to date has included the supply and installation of 10,000m2 of screeding, large-format floor tiles, precast stair units, vinyl flooring and structural movement joints.
If you’d like to learn more about our work in the aviation sector, talk to us today.
DMC was chosen by Tube Lines to undertake major renovation works at the station.
View project